A new traffic signal has been installed at the intersection of Allan Boyd and outbound Airport Boulevard by Terminal B.
Fun Facts
Fun Facts
- Three Public Level Arrivals / Departures Terminal
- 19-Gate Airside Concourse
- International Arrivals Facility
- Dual Shuttle Automated People Mover System
- Two-Level Landside Access Roadway
- 669,000 Square Feet Terminal / Airside
- 185 Room In-Terminal Hotel
- 19,557 Square feet of Landside Concessions
- 23,107 Square feet of Airside Concessions
- 5,535 Car Parking Structure
- $8MM Public Art Program
- $1.27B Program Budget (Estimated)
- 2,400 new jobs
- $948 million in wages added to the region
Green Facts
- Goal of obtaining at least LEED Silver for Landside
- Use of recycled materials in building structure, floor, & ceiling finishes
- Extensive use of day-lighting to offset energy use
- Natural ventilation provided when possible
- Low-E glass to minimize heat gain through glazing
- Low-flush fixtures used throughout facility
