A new traffic signal has been installed at the intersection of Allan Boyd and outbound Airport Boulevard by Terminal B.
About The Project
About the Project
Sacramento County Airport System has begun construction on a Terminal Modernization Program at Sacramento International Airport. The program is designed to meet future air travel demand by replacing the outdated 216,000 square foot/13 gate Terminal B. During planning for the project, multiple designs were created. Through an evaluation process, the Central Terminal B concept was identified as the clear choice for future development. This concept will meet the travel needs of Sacramento's growing population and maintain Sacramento International Airport's ease-of-use and convenience.
The new facilities will feature:
- Landside Terminal Building with Integrated Hotel
- Airside Concourse
- Automated People Mover (APM)
- Two-level Structured Roadway
- Cross-field Taxiway and Apron Paving
- New Terminal B Parking Garage with Pedestrian Bridge Connection
Notable aspects of this gateway to the Sacramento region include:
- Intuitive / Efficient Plan
- Interconnected Levels for Easy Way-finding
- Design for Expansion to Accommodate Future Growth
- Minimal Construction Phasing
- Maintains Easy Come / Easy Go Process